Add a subcontractor and assign their items
Which lines a sub owns, and at what rate.
WhereProject → Subs → + Add Sub, then the pencil on the sub
Steps
- Add the sub with a name and contact.
- Open the item picker and check every bid item the sub is doing.
- Leave the rate blank if the sub gets the full bid rate. Enter a rate when their price is different from yours.
What it affects
- The Subs tab shows each sub's earned-to-date at their rate as quantities are logged on their items.